Design and implementation of efficient engineering solutions for complex industrial systems.
Union Iron & Steel Co, Abu Dhabi
Modernization of the converter exhaust gases cleaning & cooling system Start-up in 2018 Dust concentration after converter 120 g/m3 Dust concentration after cleaning less than 50 mg/m3 Optimized water & energy Consumption
Unisteel, Fujairah
Design & Construction of (Greenfield) Plant to produce electrolytic tinplate Place Miory city, Vitebsk oblast, Republic of Belarus Start-up IV quarter 2019 The project consists of two main stages: Stage 1 : Construction of plant with capacity of 150K t/y Stage 2 :Extension of product ion capacity to 240K t/y
ArcelorMittal Temirtau, Kazakhstan
Design and construction of the lime burning shop rotary kiln 3 gas and dust cleaning system Place : Temirtau city, Karaganda oblast, Republic of Kazakhstan End of construction : 2013 Total gas consumption :142 000 m3/hour System entry dust concentration :6 800 mg/nm3 System exit dust concentration :45 mg/nm3
IRS, Uzbekistan
Engineering, Procurement & Supply of Equipment for Acid Neutralization System
AOI Egypt
Arab Organization of Industrialization (AOI) , Project : supply, installation, and commissioning of the K-KMC-MM Center of Gravity Measurement Device, along with onsite training and installation support.